Studio Way, Borehamwood

Studio Way, Borehamwood

An existing system built laboratory was stripped back to its steel frame and refurbished as the new headquarters for the Kentish Property Group and other associated companies. The brief required that each company had a clearly defined space but retained the ability to interact with other members.

The building, as found, was a warren of drab cellular offices and
corridors wrapped around an open courtyard. In the new scheme, the courtyard has been reconceived as a kind of town square, providing a point of arrival and a focus to the building’s circulation system. This new arrangement makes orientation easier and removes the need for corridors.

The first phase of construction was designed and built in six months. The remainder was completed with the owner in occupation.

Budget: £10 million
Completion date: 1993

Click here for a Full Project List

 
Print
   
 
 
 

Studio Way, Borehamwood

Studio Way, Borehamwood

An existing "Clasp" system buidling was stripped back to its steel frame and refurbished as the new headquarters for the Kentish Property Group and a number of other associated companies. The brief required that each company had a clearly defined area but retained the ability to interact with other members.

The building, as found, was a warren of drab cellular offices and corridors wrapped around an open courtyard. In the new scheme, the courtyard has been reconceived as a kind of town square, providing a point of arrival and a focus to the building's circulation system. This new arrangement makes orientation easier and removes the need for corridors.

The first phase of construction was designed and built in six months. The remainder was completed with the owner in occupation.

Budget: £10 million
Completion date: 1993